Pebble Beach lots for sale: water, permits and what to check before you buy land

Buyer guide · Pebble Beach · Updated November 2026

Pebble Beach lots for sale: water, permits and what to check before you buy land

A vacant lot in the Del Monte Forest is a different purchase from a finished house. The price you pay is only the start: water, forest rules, the Architectural Review Board and Monterey County all shape what you can build. This guide walks through those layers using the official rules, checked Nov 9, 2026.

The short version: Before you buy a Pebble Beach lot, confirm three things in writing. First, water: under MPWMD Rule 23.5, water entitlement that an owner buys from Pebble Beach Company is tied to that one property and conveys with title, but it cannot be resold, so confirm exactly how many acre-feet (if any) are already dedicated to the lot. Second, the site: the Del Monte Forest Land Use Plan requires a biological report before development on existing lots, limits building on slopes of 30% or more, and in some watersheds caps site coverage at 9,000 square feet. Third, design: the Del Monte Forest ARB reviews every new home (usually within 30 days of a complete submittal), no tree comes down without permits from Pebble Beach Company and the county, and county design review applies to all development in the Forest.

380 AF

Rule 23.5 cap

Total acre-feet per year for all Benefited Properties, per MPWMD.

9,000 sq ft

Site coverage cap

In the Pescadero and other listed watersheds, per the LUP.

30 days

Typical ARB response

After a complete submittal, per the ARB guidelines.

30%

Slope limit

Development on slopes of 30% or more is prohibited unless it better meets the LUP.

Water

The water entitlement is the first question

On the Monterey Peninsula, a lot without a clear water source is a lot you may not be able to build on. Pebble Beach has its own path.

Where it comes from

MPWMD granted water entitlements tied to the CAWD/PBCSD recycled water project, which irrigates Del Monte Forest golf courses with recycled water. Rule 23.5 caps the total at 380 acre-feet per year. The original split was 365 acre-feet to Pebble Beach Company, 10 to J. Lohr Properties for Macomber Estates and 5 to the Hester Hyde Griffin Trust.

Who can use it

Rule 23.5 defines Benefited Properties as real property in the unincorporated Del Monte Forest (as mapped in the financing agreement), plus additions the MPWMD Board approves. Under Ordinance No. 109, Pebble Beach Company can sell portions of its entitlement to other Del Monte Forest properties.

It stays with the land

Water Use Permits are conveyed to the next owner as part of the transfer of title. Entitlement bought separately from Pebble Beach Company can only be used on the property it was dedicated to, and that owner cannot resell it.

Why buyers care

Rule 23.5 says a Water Use Permit entitles the owner to Cal-Am service, including meters, notwithstanding a moratorium, once fees are paid and a complete Water Permit application is filed. It does not stop MPWMD from curtailing use in a drought emergency.

What to ask for

Ask the seller for the MPWMD Water Use Permit or entitlement paperwork that shows the acre-feet dedicated to the parcel, and confirm it with MPWMD before you remove contingencies. Capacity fees are calculated under MPWMD Rule 24.

More on water

How credits, permits and the retrofit rules at sale work across the Peninsula: water credits and permits.

The site

What the Del Monte Forest Land Use Plan asks of a lot

Pebble Beach sits in the coastal zone, and the county’s Del Monte Forest Land Use Plan (amended 2012) sets the site rules.

Biological report

Policy 16 requires a biological report by a qualified biologist before development on existing legal lots of record, to find rare or sensitive species and habitat and set siting standards. The LUP names Yadon’s piperia and native Monterey pine forest among the resources it protects.

Trees and forest

Development that could affect trees needs a forest management plan (Policy 31). Tree removal inside forest habitat the county treats as environmentally sensitive is prohibited except for restoration. Removed native trees are replaced on site per the approved plan (Policy 35).

Slopes and coverage

Development on slopes of 30% or more is prohibited unless that siting better meets the plan (Policy 78). In the Pescadero watershed, the smaller Pebble Beach watersheds draining to Carmel Bay, Seal Rock Creek and Sawmill Gulch, new homes are capped at 9,000 square feet of total site coverage, buildings plus paving (Policy 77).

17-Mile Drive frontage

New development fronting 17-Mile Drive keeps a minimum 100-foot setback from the road centerline unless vegetation or terrain screens it and is maintained for that purpose (Policy 84).

Hazards and history

Technical reports are required for geologic, fire and other hazards (Policy 38), and an archaeological survey is required if the property has never had one (Policy 58). Shoreline lots carry extra rules; see Pebble Beach oceanfront homes.

Coastal permits

Because all of the Del Monte Forest is seaward of the first through public road, county coastal permit decisions there are appealable to the Coastal Commission. See coastal development permits.

Design review

Two approvals: the ARB and Monterey County

Every new home goes through private design review and county review. One does not replace the other.

Architectural Review Board

The Del Monte Forest ARB generally responds within 30 days of a correctly completed submittal and can take longer for complex projects. Approval lapses after one year unless work has started or the ARB grants an extension. Preliminary plans are preferred for larger proposals, and the ARB encourages getting preliminary approval before applying to the county.

Height and deed limits

County zoning governs height. The ARB guidelines say the main structure may not exceed 30 feet depending on location and lot size, some subdivisions cap at 27 feet, and some lots are deed-restricted to one story. It is the owner’s job to find out.

Trees

No tree may be removed in the Del Monte Forest without a tree permit from Pebble Beach Company and Monterey County, per the ARB guidelines.

County design review

The Land Use Plan requires county design review for all development in the Del Monte Forest (Policy 66). A guesthouse is limited to one per main home, no kitchen and 425 square feet (Policy 74).

More detail

The ARB process step by step: building or remodeling in Pebble Beach. Second units: ADU rules.

Step by step

How a lot purchase usually unfolds

The order matters, because the expensive surprises come from water and the site.

1. Water first

Get the entitlement or water records for the parcel and confirm them with MPWMD.

2. Title and deed restrictions

Read the recorded deed restrictions and CC&Rs for height, story limits and easements, including any conservation or scenic easements held by the Del Monte Forest Foundation.

3. Early site studies

A biologist, arborist and, on sloped or coastal lots, a geotechnical engineer can tell you what the site will allow before you commit.

4. Talk to the ARB and county

A preliminary ARB review and a county pre-application conversation help test the building envelope.

5. Budget the carrying costs

Property tax is reassessed at purchase. See property taxes and Pebble Beach fees.

Checklist

Questions to answer before you remove contingencies

Water

How many acre-feet are dedicated to this parcel, and is the paperwork recorded with MPWMD?

Habitat

Has a biological report been done, and does any part of the lot fall in Monterey cypress or other sensitive habitat?

Slope and coverage

How much of the lot is under 30% slope, and is it in a 9,000-square-foot coverage watershed?

Trees

Which trees would come out for the house and driveway, and what does the forest management plan require?

Design limits

What height and story limits apply under the deed and county zoning?

Insurance

Forested lots can be harder to insure. See home insurance.

From the buyer’s side

Looking at a Pebble Beach lot?

I help buyers check water, title and site limits on Pebble Beach land before they commit, and I bring in the right biologist, arborist and architect early. I represented the buyer of 1424 Oleada Road in Pebble Beach in 2025.

Start with a 30-minute call.

Want a second set of eyes on the water?

Call or text 831-747-0310, or book a 30-minute call.

Before you rely on this

  • Water rules are from MPWMD Rule 23.5 and the Ordinance 109 findings, site rules from the Del Monte Forest Land Use Plan (2012 amendment) and design rules from the Del Monte Forest ARB residential guidelines (April 2022), all checked Nov 9, 2026.
  • Every parcel is different. Confirm water, deed restrictions and permit requirements with MPWMD, Pebble Beach Company, the ARB and Monterey County for the specific lot.
  • No lot prices or counts are given here: my Pebble Beach stats track single-family homes only.

Pebble Beach lots: quick questions

Does every Pebble Beach lot come with water?

No. Some parcels have water entitlement dedicated to them and some do not. Confirm the acre-feet tied to the parcel with MPWMD before you buy.

Can I buy Pebble Beach water entitlement and move it to another lot later?

No. Under MPWMD Rule 23.5, entitlement bought separately from Pebble Beach Company can be used only on the property it was dedicated to, and the owner cannot resell or convey it separately. It does pass to the next owner of that property with title.

Does a water moratorium stop a lot with entitlement from getting a meter?

Rule 23.5 says a Water Use Permit entitles the owner to Cal-Am service, including meters, notwithstanding a moratorium, once fees are paid and a complete Water Permit application is filed. MPWMD can still curtail use during a drought emergency.

How long does ARB review take for a new home?

The ARB guidelines say it generally responds within 30 days of a correctly completed submittal, and may take longer for complex projects. County review is separate.

Can I remove trees to build?

Only with a tree permit from Pebble Beach Company and Monterey County. The Land Use Plan requires a forest management plan for development that affects trees and bars removal in sensitive forest habitat except for restoration.

How big a house can I build on a Pebble Beach lot?

It depends on zoning, deed restrictions and site limits. In some watersheds the Land Use Plan caps total site coverage at 9,000 square feet, and the ARB guidelines describe height limits of 30 feet, 27 feet in some subdivisions, or one story by deed on some lots.

Who do I hire first?

Start with water and title, then a biologist and arborist, and a geotechnical engineer on sloped or coastal sites. An architect who knows the ARB helps test the building envelope early.

Updated November 2026 · Facts checked Nov 9, 2026 against MPWMD, the Del Monte Forest Land Use Plan and the Del Monte Forest ARB

Be in the loop

Get The Balog Report.

Peninsula market notes, Carmel-by-the-Sea and Pebble Beach listings worth a look, and the practical local tips I share with clients between showings.

Want a sample? Read the latest issue. Planning a move? Get in touch.

Please enter a valid email.

Unsubscribe anytime.

You’re in. Thank you!
The next issue of The Balog Report will land in your inbox. Can’t wait? Read the latest issue.
Jonathan Balog, Broker Associate | Compass | DRE# 01980970
6th Ave. 2 SW of San Carlos St., Carmel-by-the-Sea, CA 93921

Check out this article next

Carmel-by-the-Sea vs Monterey: which one fits how you want to live?