New construction in Carmel-by-the-Sea: teardowns, rebuilds and what it takes to build new
Searching for new homes in Carmel-by-the-Sea usually leads to one of two things: a house someone has just rebuilt, or an older cottage a buyer hopes to replace. Either way, the city decides what can be built. Here is what the city’s own records and rules say, and what to check before you buy.
By Jonathan Balog, Broker Associate, Compass · Carmel-by-the-Sea · Facts checked Nov 22, 2026
The short version: New homes in Carmel-by-the-Sea almost always replace an existing house. In the city’s design review records from February 2021 to August 2026, compiled on my stats page, 16 approved projects were a demolition plus a new single-family home and 2 were new homes on vacant lots. Building new goes through Track Two design review, a three-phase process with a Planning Commission hearing. A house over 50 years old may need a historic evaluation first, and a structure deemed historic cannot be demolished. On a lot of 4,000 square feet or less, base floor area is 45% of the lot, two stories at most. You also need a water permit from the Monterey Peninsula Water Management District before a building permit.
Demo and rebuild
Approved in design review, Feb 2021 to Aug 2026.
On vacant lots
New homes on vacant lots in the same records.
Track Two
Site assessment, design concept, final details.
Base floor area
Of lots 4,000 sq ft or smaller.
Why most new homes here are rebuilds
The numbers come from the city’s own permit reports and design review records.
| Count | What it covers | |
|---|---|---|
| Demolition plus a new house | 16 | Approved design review projects, February 2021 to August 2026 |
| New house on a vacant lot | 2 | Same records and period |
| New house (other) | 3 | Same records and period |
| Addition or remodel | 31 | Same records and period, for comparison |
| Main-house demolitions in 2025 | 8 | City monthly building reports |
| New single-family home permits in 2025 | 9 | City monthly building reports; the high for 2021 to 2026 |
Source: the teardowns and rebuilds section of my Carmel-by-the-Sea market stats page, compiled by hand from the city’s monthly building reports and design review records. Some months’ reports were never published, so counts may be low for some years. 62 approved building projects were in design review over the period.
What that means for buyers
A ready-made new house is a rare listing here. Most buyers who want new construction either buy one of the few recent rebuilds or buy an older house and go through the city process themselves.
What it means for sellers
An older house on a good lot can draw buyers who plan to rebuild. They will ask about historic status, trees and water before they make an offer, so it helps to have answers ready.
Four things to check before you buy a house to replace
Each one can stop or shrink a rebuild. Check them during your contingency period, not after closing.
Is the house historic?
The city keeps an Inventory of Historic Resources. A house that is not on it but is over 50 years old may need a historic evaluation before any permit for exterior work. If the city finds it ineligible, it issues a written Determination of Ineligibility.
A structure deemed historic cannot be demolished. Additions and alterations must meet the Secretary of the Interior’s Standards.
- 50-year rule
- No demolition if historic
What do the trees allow?
Track Two starts with a preliminary site assessment, with a topographic survey reviewed in the field by the City Forester and the Director. It is required for new construction, demolition and work near significant trees.
The city’s FAQ says maximum floor area may not be achievable on sites with steep slopes, significant trees or unusual shapes.
- City Forester
- Site assessment
How big can the new house be?
On a site of 4,000 square feet or less, base floor area is 45% of the lot, so 1,800 square feet on a typical 4,000 square foot lot. The percentage drops as lots get larger: 41% on a 6,000 square foot lot.
Two stories at most. West of Carmelo Street in the Beach and Riparian Overlay District, the height limit is 18 feet. Patios, walkways, driveways, decks and hot tubs count as site coverage, which has its own limits.
- Floor area
- Two stories
Is there water for what you want?
The Monterey Peninsula Water Management District says a water permit is what lets an applicant get a building permit and set or intensify a water meter.
The city says water credits in single-family homes are based on existing fixtures, and a one-bathroom home can add a second bathroom without a water allocation. Malpaso Water Company, which the city’s FAQ still lists, has sold out. See the new water section below.
- MPWMD permit
- Fixture credits
Pull the city’s property file early. The city says it keeps a file on every property in city limits, viewable through its planning GIS map. Ask what earlier approvals, conditions and historic determinations are on record.
How a rebuild moves through the city
A short map of the steps. The full permit detail is in my Carmel-by-the-Sea building permits guide.
Historic determination
Exterior projects start with a determination of the property’s historic status. Listed properties go to the city’s historic preservation consultant and the Historic Resources Board.
Track Two design review
The city’s code puts new dwellings, rebuilds and substantial alterations in Track Two. It is three phases: preliminary site assessment, design concept review and final details review, with public notice and a Planning Commission hearing. The application is not complete until the site assessment has happened.
Building permit
The building permit is a separate city permit under the California Building Code. It usually comes after the planning permit, once the final plans reflect the design review conditions.
Coastal zone
The city says Carmel-by-the-Sea is entirely within the California coastal zone. Its code describes Track One as for projects that do not need a coastal development permit, so ask the Planning Division how coastal review applies to your rebuild.
Construction hours
8:00 a.m. to 6:30 p.m., Monday through Saturday. No construction on Sunday.
Contractors
The city requires a business license for contractors operating in the city. See how to hire a builder for license and contract checks.
City: design review process ↗CMC 17.58 ↗City permit guide (PDF) ↗
New water: Pure Water Monterey and the meter moratorium
Recycled water has changed the supply. It has not yet opened new meters.
Malpaso Water Company
Malpaso Water Company used to sell water entitlements to properties in Carmel-by-the-Sea and the Carmel River watershed. The Carmel Pine Cone reported in January 2019 that its last sales had closed and all of its water was spoken for. Malpaso has sold out, so residents can no longer buy water credits or a water allocation from it, even though the city’s planning FAQ still lists it.
Recycled water now supplies most of the Peninsula
MPWMD says the expansion of Pure Water Monterey, an advanced water recycling project built by Monterey One Water, MPWMD and the Marina Coast Water District, was completed in October 2025 and now supplies 60% of the Peninsula’s drinking water. The purified water is injected into the Seaside Groundwater Basin and later pumped by California American Water for its customers.
The city’s share
Carmel-by-the-Sea received 14 acre-feet of water from the expansion, and the city says its allocation cannot be sold. Under Resolution 2025-097 the city set aside 6 acre-feet for residential use. Its April 6, 2026 update showed 1.163 acre-feet of that committed and 4.837 remaining.
The catch: an existing meter
MPWMD says that to use an allocation, a project must have an existing water meter and the city must approve a release of water. Projects that need a new meter are still under the State Water Board’s cease and desist order on Cal Am, which bars new connections served from the Carmel River.
What could change
In October 2025, MPWMD asked the State Water Board to lift that condition. Closing briefs were due November 17, 2026, and no decision was posted on the Board’s Cal Am page as of November 22, 2026. The City of Monterey says a proposed order will go out for public comment before a final vote it expects in early 2027.
What it means for building new
A teardown already has a meter, so a rebuild that needs more water can ask the city for a release from its allocation. A vacant lot needs a new meter, so unless it already holds water from a private entitlement, it waits on the State Water Board. Confirm the water for a specific property with the Planning Division and MPWMD before you buy.
MPWMD: Pure Water Monterey ↗Monterey One Water: expansion ↗MPWMD 2025 annual report (PDF) ↗City water allocation update, Apr 2026 (PDF) ↗State Water Board: Cal Am order ↗City of Monterey: hearing ↗Carmel Pine Cone, Jan 25, 2019 (PDF) ↗Water credits guide
Building to today’s energy and water rules
A rebuild is designed to current state codes, which shape cost and design.
2025 Energy Code
The California Energy Commission says buildings whose permit applications are applied for on or after January 1, 2026 must comply with the 2025 Energy Code. It expands the use of heat pumps in new homes, encourages electric-readiness and strengthens ventilation standards.
Landscape water rules
MPWMD Rule 142.1 applies to new landscapes over 500 square feet tied to a building permit or design approval, including landscapes that go with a demolition and rebuild.
Earthquake and site risk
A new foundation is a chance to deal with site conditions. See earthquake risk in Carmel and Pebble Beach and, for low-lying lots near the river, Carmel River flooding.
Energy Commission: 2025 code ↗MPWMD: water permits and Rule 142.1 ↗
Buying a house that was just built or rebuilt
A newly built house has its own paper trail. Ask for it.
The approvals
Ask for the design review approval and conditions, the building permit and the final inspection sign-off, and any historic determination for the old house.
Builder protections
California’s construction defect law in Civil Code Title 7 applies to original construction intended to be sold as an individual dwelling unit. Section 941 generally limits actions under it to 10 years after substantial completion. Ask your attorney how it applies to the house you are buying.
Warranties and manuals
Ask for written warranties on the work and on major systems, plus the energy compliance documents from the permit.
Inspect anyway
New does not mean defect-free. A general home inspection is still worth doing, and the inspector can review the permit set.
Selling a house a buyer might replace
Buyers planning a rebuild price in time and risk. Answers help.
Know the historic picture
If the house is over 50 years old and has no determination on file, a buyer will want to know whether it could be found historic. Ask the Planning Division how a determination works for your property.
Have the water facts
Count the fixtures and gather any water permit history. Buyers will compare that with the house they want to build.
Tree and survey records
Any recent survey, arborist report or tree permit helps a buyer judge the site early.
Earthquake disclosure note
For older one-to-four-unit wood-frame homes built before 1960, state law requires the seller to deliver the Homeowner’s Guide to Earthquake Safety and an earthquake hazards disclosure, but it does not apply when the buyer agrees in writing to demolish the house within one year. See earthquake risk.
Related guides
Other guides on this site that pair with this one.
- Buying a home in Carmel
- Buying a home in Carmel-by-the-Sea
- Buying a home in Pebble Beach
- Best real estate agent in Carmel
- Choosing an agent in Carmel-by-the-Sea
- Best real estate agent in Pebble Beach
- Carmel-by-the-Sea building permits
- Historic homes in Carmel-by-the-Sea
- Tree permits
- Water credits
- ADU rules
- Carmel-by-the-Sea market stats (incl. teardowns)
- New construction in Pebble Beach
- How to hire a builder
- Earthquake risk
- Selling in Carmel-by-the-Sea
Thinking about buying a house to replace? Check the city file first.
I can pull the city property file with you and go through historic status, trees, size limits and water before you commit, so the plan fits the lot.
My Carmel-by-the-Sea stats page tracks teardowns and rebuilds from the city’s own permit reports.
Carmel-by-the-Sea homesMarket statsPermits guide
Questions about a specific lot?
Call or text 831-747-0310, or book a 30-minute call. I am a Broker Associate with Compass, DRE 01980970.
Before you rely on this
- This is general information, not legal, design or construction advice. Confirm a specific project with the Community Planning and Building Department, (831) 620-2010.
- Teardown counts come from city reports compiled on my stats page; some monthly reports were never published, so counts may be low.
- Rules and codes change. Facts checked Nov 22, 2026 against the city, MPWMD, the California Energy Commission and state code.
New construction in Carmel-by-the-Sea: quick questions
Can I buy water to build in Carmel-by-the-Sea?
Not from Malpaso Water Company, which has sold out. The city has an allocation from the Pure Water Monterey expansion that cannot be sold. While the state meter moratorium stands, it goes only to projects at properties with an existing water meter that the city approves for a release.
Can I tear down a house and build a new one in Carmel-by-the-Sea?
Only with city approval. A new house or rebuild goes through Track Two design review with a Planning Commission hearing, and a house over 50 years old may need a historic evaluation first. A structure deemed historic cannot be demolished.
Are there vacant lots for sale in Carmel-by-the-Sea?
Very few. In the city’s design review records from February 2021 to August 2026, 2 approved projects were new homes on vacant lots, compared with 16 that demolished a house and built a new one.
How many teardowns happen in Carmel-by-the-Sea each year?
City permit reports show 8 main-house demolitions and 9 new single-family home permits in 2025, the high for 2021 to 2026. Some monthly reports were never published, so counts may be low.
How big a new house can I build in Carmel-by-the-Sea?
On a lot of 4,000 square feet or less, base floor area is 45% of the lot, about 1,800 square feet on a typical lot, and the percentage drops on larger lots. Two stories at most, and 18 feet west of Carmelo Street in the Beach and Riparian Overlay District.
Do I need a water permit to build a new house?
Yes. MPWMD says a water permit is what lets an applicant obtain a building permit and set or intensify a water meter. Water credits depend on the fixtures already on the property.
Which energy code applies to a new house in 2026?
The 2025 California Energy Code applies to permit applications made on or after January 1, 2026. It expands the use of heat pumps in new homes and strengthens ventilation standards.
What protections do buyers of a newly built home have?
California Civil Code Title 7 applies to original construction intended to be sold as an individual dwelling unit, with a general 10-year limit after substantial completion under Section 941. Ask an attorney how it applies to a specific house.
Get The Balog Report.
Peninsula market notes, Carmel-by-the-Sea and Pebble Beach listings worth a look, and the practical local tips I share with clients between showings.
Want a sample? Read the latest issue. Planning a move? Get in touch.
The next issue of The Balog Report will land in your inbox. Can’t wait? Read the latest issue.