Owner and buyer guide · Pacific Grove · Updated November 2026

Pacific Grove building permits: planning first, then building, with history in between

Pacific Grove has one of the largest collections of older homes on the Monterey Peninsula, and the city reviews almost any change to the outside of a house. Before you buy a cottage to update, or start on the one you own, here is how the city’s planning and building permits fit together, using the city’s own pages and handouts.

The short version: In Pacific Grove, any change to the exterior of a building needs a planning permit, including windows, siding, roofing material and even paving; interior remodels do not. A building permit is needed for almost all projects, and the city says to get the planning permit first. If a house is more than 50 years old, an Initial Historic Screening is most likely required before you submit, and homes on the Historic Resources Inventory get added review. Inside the coastal zone, most development also needs a Coastal Development Permit. Planning review can take up to 30 days, and a public hearing can add 30 to 90 days. When a house sells, the city requires a Residential Zoning Records Report before close of escrow.

Any

Exterior change

Needs a planning permit, per the city FAQ.

50 years

Historic screening

Age at which a screening is most likely required.

30 + 30-90

Days to approve

Staff review up to 30 days; a hearing can add 30 to 90.

$502

City report at sale

RZRR plus sewer lateral report, as posted.

Two permits

Planning permit vs building permit

From the city’s Frequently Asked Planning Questions handout and Building Division page.

Planning permitBuilding permit
Kitchen or bath remodel, electrical work (interior)NoUsually yes
Window changesYes, for all window changesUsually yes
Siding or roofing material changeYesUsually yes
Changes to paving coverageYesAsk the Building Division
FencesMost do not need a permit (see note)Ask the Building Division
Sheds (non-habitable accessory structures)Up to 3 without a use permitAsk the Building Division

The city says a building permit is needed for almost all projects, interior and exterior, and that the planning permit should come first. Fences in the R-1-B-4 zone need a Coastal Development Permit from the Coastal Commission. Window changes follow the city’s Residential Window Guidelines, with different rules for historic and non-historic homes.

Who can pull a permit

Anyone can apply, but the city issues building permits only to a California-licensed professional or the property owner. Contractors need a state contractor’s license, workers’ compensation insurance and a current Pacific Grove business license.

Code cycle

Projects submitted after January 1, 2026 must meet the 2025 California building codes, the city says.

School fees

Since November 6, 2023, school fees are charged on new or added square footage over 500 square feet.

Fees

Building permit fees follow the city’s adopted fee schedule; plan review fees are paid at application and are non-refundable.

Historic homes

Older and historic homes

Historic review is the step that surprises buyers most in Pacific Grove.

The 50-year screening

The city’s FAQ says that if a property is over 50 years old, an Initial Historic Screening is most likely required before project submittal. A historic consultant may be needed.

The Historic Resources Inventory

A city list of historic buildings. The Historic Resources Committee decides additions and deletions under Municipal Code Chapter 23.76; inclusion is based on criteria in Section 23.76.025, is not limited to a specific year of construction, and does not require the owner’s consent.

The committee

Five members on two-year terms, including a preservation professional and a Pacific Grove Heritage Society representative. Agendas are typically posted 72 hours before each meeting.

What reviewers look at

The city’s architectural guidelines for inventory buildings ask that additions keep the scale and character of the original, for example by placing them on a side or rear elevation or setting a new story back from the roof edge, and that character-defining features such as siding, windows, porches and roof details be preserved.

An older city appendix to the architectural guidelines describes the inventory as about 1,200 buildings built before 1927. The committee page says inclusion is not limited to a year of construction, so ask the city about a specific house.

Who decides

Who reviews what

From the city’s permit paths bulletin (adapted from Municipal Code Table 23.70.012-1).

Examples of what it decides
Staff (counter and administrative)Administrative architectural permits and design changes, for homes on or off the inventory, with notice to abutting owners
Historic Resources CommitteeHistoric determinations and Initial Historic Screening requests
Architectural Review BoardNew construction, major alterations and demolition and rebuild; major alterations to inventory buildings; historic preservation and historic demolition permits
Planning CommissionUse permits, variances, tract maps, and Coastal Development Permits

The city recommends talking to a planner at the start of a project and contacting neighbors before you apply. Planning staff hold planner-on-duty hours on Tuesdays and Thursdays from 8:00 to 11:30 a.m., with afternoon appointments, as posted Nov 25, 2026. Planning: (831) 648-3190.

Timing

The FAQ says planners may take up to 30 days to review a submittal; if a project cannot be approved by staff, the hearing process may add 30 to 90 days.

Nonconforming homes

Many older houses do not meet today’s setbacks or coverage. The city says that after a catastrophic event a nonconforming use can be re-established as it was if a building permit is issued within one year; after that it must meet current rules.

Coastal zone

Coastal Development Permits

From the city’s Development in the Coastal Zone bulletin.

The LCP

All development in the coastal zone is regulated by the city’s Local Coastal Program, certified by the Coastal Commission in March 2020. The Planning Commission is the review authority for Coastal Development Permits (CDPs).

Exemptions

Interior improvements that do not intensify use, repair and maintenance (such as in-kind siding replacement), replacement of destroyed structures under LCP rules, and temporary events are generally exempt. Staff decide at application whether a project is exempt.

Asilomar Dunes

Exceptions to the exemptions apply in environmentally sensitive habitat areas such as the Asilomar Dunes Residential Area, and near them.

Waivers and appeals

A de minimis waiver is possible but needs public notice, the Coastal Commission Executive Director’s concurrence and Planning Commission concurrence. In the appeal area, the Coastal Commission can appeal any CDP the city approves.

Trees

Tree permits

From the city’s Tree Permits page.

Permit needed to remove or substantially prune
Gowen cypressAny size
Coast live oak, Monterey cypress, shore pine, Torrey pine, Monterey pine6 inches or more in trunk diameter at 54 inches above grade
Other private trees12 inches or more in trunk diameter
Trees in or within 100 yards of designated monarch sanctuariesAll; no pruning or removal inside the sanctuaries from October 1 to May 1
Street treesAll, any size

Substantial pruning means removing more than 25 percent of live branches in 12 months, any live limb 6 inches or more in diameter, or any root 4 inches or more. An arborist report is typically required for a live tree, and each removed tree must be replaced with at least one 5-gallon tree within 60 days. In the Asilomar Dunes neighborhood, tree work tied to development may also need a CDP.

Other agencies

Other approvals a project may need

Listed on the city’s Building Division page. The permit technician sends a list for each project.

Sewer

Monterey One Water sewer permit or waiver.

Water

Monterey Peninsula Water Management District permit or waiver. For an added bathroom, the city FAQ points owners to the District.

Demolition

Monterey Bay Air Resources District for demolitions.

Coastal

California Coastal Commission permit or waiver for properties in the coastal zone, where applicable.

Regional fee

TAMC regional development impact fee.

ADUs

The city has an ADU ordinance, a handbook and a free consultation with a planner. See also ADU rules on the Peninsula.

At sale

The city report when a house sells

Pacific Grove Municipal Code Chapter 23.78.

Required before close of escrow

A Residential Zoning Records Report (RZRR, also called the City Report) is required before close of escrow or transfer of title for single-family homes, condos and apartment buildings.

What it covers

A records search and an exterior inspection; no one needs to be home. The seller certifies smoke alarm and carbon monoxide alarm installation.

Time and fee

Typically about 10 business days once complete. The combined RZRR and sewer lateral report fee is $502, plus 3.5 percent for card payments, as posted Nov 25, 2026.

Why buyers care

The report summarizes zoning, past approvals, special restrictions and code violation history. Read it alongside the permit file. See when to sell in Pacific Grove.

Working with me

Buying an older house to update? Check the city path first.

Before you write an offer on a Pacific Grove cottage you plan to change, I help you pull the city file and the RZRR, see whether the house is on the inventory or over 50 years old, and understand which reviews your plans would need.

Planning a remodel or a purchase?

Call or text 831-747-0310, or book a 30-minute call. I am a Broker Associate with Compass, DRE 01980970.

Before you rely on this

  • This is general information, not legal or permitting advice. The Pacific Grove Municipal Code and the Community Development Department are the authority.
  • Several city handouts are older (the permit paths bulletin dates to 2011); counter hours and processes can change. Confirm with Planning at (831) 648-3190 and Building at (831) 648-3191.
  • Fees are as posted on Nov 25, 2026.

Pacific Grove building permits: quick questions

Do I need a permit to replace windows in Pacific Grove?

Yes. The city requires a planning permit for all window changes, and a building permit is usually needed too. Window guidelines differ for historic and non-historic homes.

Do I need a planning permit for a kitchen remodel?

No planning permit is needed for interior improvements such as kitchen or bathroom remodels, but the city says a building permit is required for almost all projects.

Is my Pacific Grove house historic?

Ask the Planning Division whether it is on the Historic Resources Inventory. If it is over 50 years old, an Initial Historic Screening is most likely required before you submit a project.

How long does a Pacific Grove planning permit take?

The city says review can take up to 30 days, and a project that needs a public hearing may take another 30 to 90 days.

Do I need a permit to cut down a tree in Pacific Grove?

Often. Gowen cypress need a permit at any size, several native species at 6 inches in trunk diameter, other private trees at 12 inches, and all street trees. Trees near monarch sanctuaries have extra limits.

What is an RZRR in Pacific Grove?

A Residential Zoning Records Report the city requires before close of escrow on homes, condos and apartments. It takes about 10 business days, and the combined RZRR and sewer lateral report fee is $502 as posted Nov 25, 2026.

Can you help me buy a house I want to remodel?

Yes. I help buyers check the city file, the RZRR and the historic status before an offer, so plans and price line up.

Updated November 2026 · Facts checked Nov 25, 2026 against the City of Pacific Grove (Planning, Building Permits and Inspections, Historic Resources Committee, Tree Permits, RZRR and ADU pages, and planning handouts)
Be in the loop

Get The Balog Report.

Peninsula market notes, Carmel-by-the-Sea and Pebble Beach listings worth a look, and the practical local tips I share with clients between showings.

Want a sample? Read the latest issue. Planning a move? Get in touch.

Please enter a valid email.

Unsubscribe anytime.

You’re in. Thank you!
The next issue of The Balog Report will land in your inbox. Can’t wait? Read the latest issue.
Jonathan Balog, Broker Associate | Compass | DRE# 01980970
6th Ave. 2 SW of San Carlos St., Carmel-by-the-Sea, CA 93921