Monterey County building permits: what buyers and owners need in unincorporated Carmel, Carmel Valley and the Highlands
Outside city limits, construction is handled by Monterey County Housing and Community Development, not the City of Carmel-by-the-Sea. That covers much of what people call Carmel (the unincorporated neighborhoods around the city), Carmel Valley and Carmel Highlands. Here is how county building permits, planning permits and coastal rules fit together.
The short version: In unincorporated Monterey County, almost any structure needs a construction permit from Housing and Community Development at 1441 Schilling Place in Salinas. Building permits are ministerial if the plans meet code; planning permits (use permits, design approvals, coastal development permits) are discretionary. Coastal-zone parcels use Title 20; inland parcels use Title 21. Check zoning in Accela Citizen Access before you buy or design. Water is often the real gate: within the Monterey Peninsula Water Management District and Cal-Am service area, the county says there is generally no new water for new houses, and planning will not accept applications without an assured water source.
Not the city
Unincorporated Carmel, Carmel Valley, Highlands, Pebble Beach.
Coastal vs inland
Zoning ordinances differ by zone.
Look up zoning
Address, APN or file number.
Plan check (typical)
County FAQ as of Nov 5, 2026; times vary.
When the county is in charge
Carmel-by-the-Sea has its own building department. This page is for everything outside that city.
Unincorporated Carmel
Neighborhoods around Carmel-by-the-Sea that are not inside the city limits—often called Carmel in listings—are usually under Monterey County. Always confirm the jurisdiction on the parcel, not the marketing name.
Carmel Valley and the Highlands
Carmel Valley and Carmel Highlands are largely unincorporated and go through county HCD for building and planning.
Pebble Beach
Pebble Beach (Del Monte Forest) is unincorporated coastal zone under the county, plus Pebble Beach Company architectural review. See building or remodeling in Pebble Beach.
Carmel-by-the-Sea is different
Inside the city, use the city’s process. See Carmel-by-the-Sea building permits.
Building permits vs planning permits
Two different kinds of approval, often both required.
Construction (building) permits
Issued by Building Services to make sure structures are safe. Types include building, electrical, mechanical, plumbing, combination and grading. A property owner can pull a permit for work on a single-family or duplex residence; otherwise a licensed contractor.
When grading needs a permit
Among other triggers, when cut and fill total 100 cubic yards or more, when a driveway over 50 feet is graded, or when grading is on slopes over 30% (25% in North County).
Small exemptions (still check planning)
The county FAQ: a one-story detached shed or similar accessory structure up to 240 square feet with no electrical, plumbing or mechanical work and not used for hazardous materials or vehicles may not need a construction permit. Planning setbacks and design rules can still apply.
Planning (discretionary) permits
Use permits, variances, design approvals, subdivisions and coastal development permits address use, location and appearance. They can be approved with conditions or denied. Complex projects often go through a Development Review Committee before a formal application.
Design Approval
Required for exterior changes in Design Control (“D”), Site Plan Review (“S”) or Visual Sensitivity (“VS”) overlays, and for all parcels in the Big Sur, Carmel and Del Monte Forest Coastal Land Use Plans—even some work that does not need a building permit.
Title 20, Title 21 and coastal development permits
Your parcel’s zone changes the path.
Look up zoning first
Use Accela Citizen Access with the address or APN. A designation like MDR/B-8-D (CZ) means medium-density residential with overlays, in the coastal zone.
Coastal Zone
Title 20 applies. Many projects need a Coastal Development Permit or a coastal exemption after staff review. See coastal development permits in Monterey County.
Inland
Title 21 applies. Use permits and design approvals follow inland rules.
Fees
County land-use and building fee schedules were updated effective April 4, 2026 (Board resolution RES 26-017). Check the current fee estimator before you budget.
Why water stops more projects than plan check
Especially on the Monterey Peninsula.
Cal-Am / MPWMD
The county FAQ states that, in general, there is currently no new water available for unincorporated parcels inside the Monterey Peninsula Water Management District that are served by California American Water. Planning does not accept applications for projects without an assured water source, including new houses and remodels that need more water.
Wells
If you cannot get a Cal-Am connection, the county points you to Environmental Health and MPWMD about wells. See also Monterey Peninsula water credits.
Buyer takeaway
Before you remove contingencies on a tear-down or major addition in unincorporated Carmel, Carmel Valley or the Highlands, confirm water capacity in writing.
Permit Center, Accela and plan check
Practical steps.
Where
HCD Permit Center, 1441 Schilling Place, South 2nd Floor, Salinas, CA 93901. Front counter 8 AM – 4 PM Monday–Friday. Phone (831) 755-5025.
Online
Accela Citizen Access for applications, status, zoning lookup, re-roofs, small solar and more. The county’s Digital Plan Room (ePermitHub) is scheduled to start September 1, 2026.
Planning first when unsure
For planning permits, start with the Application Request Form and Scope of Work. If you are sure you only need a construction permit, you can apply at Schilling Place.
Plan check timing
The county’s building FAQ currently cites about 6 to 8 weeks for plan check; simpler over-the-counter permits can be same-day or a few days.
Inspections
Schedule through Accela or by phone. Job card and approved plans must be on site.
Buying or remodeling outside city limits?
I help buyers and owners map which agency is in charge, what water and coastal rules mean for a specific parcel, and whether a remodel pencil makes sense before you remove contingencies.
I represented the buyers of San Antonio 2 SW of 10th ($7M) and Lincoln 3 NE of 5th ($4.4M), and both sides of Torres 2 SE of 10th ($5.54M). I represented the buyer of 1424 Oleada Road in Pebble Beach in 2025.
Buying in CarmelCarmel homesCarmel Valley homes
Let’s check the parcel
Call or text 831-747-0310, or book a 30-minute call.
Before you rely on this
- Details are from Monterey County HCD Permit Center, Building & Planning FAQs, Permit Fees & Types, and Online Permit Information pages, checked Nov 5, 2026. Fee schedules, plan-check times and water policy change; confirm with HCD for your APN.
- “Carmel” on this page means the unincorporated Carmel area under county jurisdiction, not the City of Carmel-by-the-Sea.
- This is general information, not legal advice or a substitute for a licensed architect or contractor.
Monterey County building permits: quick questions
Do I need a Monterey County permit to remodel in Carmel Valley?
Usually yes. Almost any structure needs a construction permit, and exterior changes often need planning or design approval depending on zoning. Confirm with HCD for your APN.
Is unincorporated Carmel the same as Carmel-by-the-Sea?
No. Carmel-by-the-Sea is an incorporated city with its own permits. Unincorporated Carmel around the city uses Monterey County HCD.
What is Accela Citizen Access?
The county’s online system to look up zoning, submit many applications, check status and schedule inspections.
Why would a new house application be refused?
Inside the MPWMD Cal-Am area, the county says there is generally no new water for new houses, and planning will not accept applications without an assured water source.
How long does plan check take?
The county’s FAQ currently cites about 6 to 8 weeks for typical plan check. Simple permits can be much faster.
Where is the Permit Center?
1441 Schilling Place, South 2nd Floor, Salinas, open 8 AM – 4 PM Monday–Friday. Phone (831) 755-5025.
Do I need a coastal permit for every coastal-zone project?
Not always. Staff may issue a coastal exemption. Many projects still need a Coastal Development Permit. See the coastal permits guide on this site.
Updated November 2026 · Facts checked Nov 5, 2026 against Monterey County Housing and Community Development
Get The Balog Report.
Peninsula market notes, Carmel-by-the-Sea and Pebble Beach listings worth a look, and the practical local tips I share with clients between showings.
Want a sample? Read the latest issue. Planning a move? Get in touch.
The next issue of The Balog Report will land in your inbox. Can’t wait? Read the latest issue.


