Point-of-sale requirements when you sell in Carmel and Pebble Beach: the checklist, and who handles each item
Some requirements only come up when a house changes hands. On the Monterey Peninsula they come from the state, the water district, the sewer district and, in fire zones, the fire rules. None is hard on its own. Together they are easy to miss until escrow is already open.
By Jonathan Balog, Broker Associate, Compass · Carmel-by-the-Sea · Facts checked Nov 23, 2026
The short version: Every change of ownership in the Monterey Peninsula Water Management District triggers Rule 141 water-efficiency retrofits; the seller or buyer can do them, and the buyer can request up to six months. Homes served by the Carmel Area Wastewater District, which includes Carmel-by-the-Sea, need a video inspection of the sewer lateral on sale unless the whole lateral was replaced in the last 10 years. State law requires a seller to deliver a written statement that the house has an operable smoke alarm, to certify that water heaters are braced, anchored or strapped, and to disclose whether noncompliant plumbing fixtures remain. Carbon monoxide devices are required where there is a fossil-fuel appliance, fireplace or attached garage. In a high or very high fire hazard severity zone, the seller provides defensible space documentation or signs an agreement for the buyer to get it.
Water retrofit
Triggered by every change of ownership.
Sewer lateral waiver
If the whole lateral was replaced.
Retrofit extension
From the purchase date, on request.
Fire zone documentation
Required of sellers since this date.
The checklist at a glance
What applies, where it applies, and the source. Details follow below.
| Where it applies | Who usually handles it | |
|---|---|---|
| Water-efficiency retrofit (MPWMD Rule 141) | Every change of ownership within MPWMD | Seller or buyer; certification form to MPWMD |
| Sewer lateral video inspection (CAWD) | Homes served by CAWD, including Carmel-by-the-Sea | Licensed plumbing contractor; report to CAWD |
| Smoke alarm statement | Single-family homes sold in California | Seller, in writing |
| Carbon monoxide devices | Homes with a fossil-fuel appliance, fireplace or attached garage | Owner |
| Water heater bracing certification | Any property with a water heater | Seller, in writing |
| Plumbing fixture disclosure | Single-family homes | Seller, in writing |
| Defensible space documentation | High or very high fire hazard severity zones | Seller, or buyer by written agreement |
| Condition and agency disclosures | Residential sales | Seller and agents |
Water: MPWMD Rule 141 retrofits
The one requirement that applies to almost every sale on the Peninsula.
What triggers it
MPWMD says all real property transfers of ownership trigger the water conservation requirements in its Rule 141. Properties with a private well have more requirements.
What is required
High-efficiency or ultra-high-efficiency toilets; showerheads at 2.0 gallons per minute or less; bathroom faucets at 1.2; kitchen, utility and bar faucets at 1.8 (with a temporary 2.2 boost allowed); and a rain sensor on automatic irrigation unless it is weather-based.
Who does it
The seller or the buyer may complete the retrofits. Once done, complete the Water Efficiency Standards Certification Form and send it to MPWMD.
More time
You can request an extension of up to six months from the purchase date by returning a Water Conservation Certification. See water credits and Rule 141.
Sewer: the lateral video inspection
Which rule applies depends on the sewer district, not the city line.
CAWD homes
CAWD says that upon a sale, or a remodel of more than $50,000, the existing lateral must be inspected by video to verify it is in acceptable condition. A licensed plumbing contractor submits the inspection report, and the District Engineer decides whether it passes.
Waiver and failures
The inspection can be waived if the entire lateral was replaced in the last 10 years. A lateral that fails must be replaced or repaired. CAWD says it does not charge a fee for the program.
Pebble Beach
Pebble Beach homes are on the PBCSD system. Ask PBCSD at (831) 373-1274 whether anything applies to a sale.
Full detail
Service areas, the transfer-of-responsibility form and timing are on sewer lateral inspections.
Smoke alarms, carbon monoxide devices and water heaters
Three state rules, each with its own paperwork.
Smoke alarm
Every single-family home that is sold must have an operable smoke alarm, and the seller must deliver a written statement of compliance, either in the purchase agreement, an addendum or a separate document.
Carbon monoxide
Owners of existing single-family homes with a fossil-fuel heater or appliance, a fireplace or an attached garage must have a carbon monoxide device installed.
Water heater
All residential water heaters must be braced, anchored or strapped against earthquake motion, and the seller must certify this to the buyer in writing.
Plumbing fixtures
Noncompliant plumbing fixtures were to be replaced by January 1, 2017, and the seller must disclose that requirement in writing and whether any noncompliant fixtures remain.
Health and Safety Code 13113.8 ↗Health and Safety Code 17926 ↗Health and Safety Code 19211 ↗Civil Code 1101.4 ↗
Fire hazard zones: defensible space documentation
Only for homes in a high or very high fire hazard severity zone.
The rule
Since July 1, 2021, a seller of a home in a high or very high fire hazard severity zone must give the buyer documentation that the property complies with state or local defensible space rules, where a local ordinance or an available inspection provides it.
If you do not have it
The seller and buyer sign a written agreement that the buyer will obtain the documentation. Where there is no local ordinance but an inspection is offered, the buyer has one year from the close of escrow.
The zones
PBCSD describes defensible space as Zone 0 (the first five feet), Zone 1 (5 to 30 feet) and Zone 2 (30 to 100 feet). Check which agency covers the address and what it currently requires.
Which homes
For the city map and its 2025 adoption, see Carmel-by-the-Sea fire hazard zones. For insurance, see home insurance.
Permit history and disclosures
Not a separate inspection, but the item most likely to slow an escrow.
Disclosures
DRE describes the seller’s disclosure statement on the property’s condition and the agent’s duty to do a visual inspection and disclose readily observable defects. Additional disclosures can apply depending on location and age.
County addresses
For unincorporated Carmel and Pebble Beach, the county prepares a Residential Escrow Report on a property’s permit history to help with the state disclosure form. The fee is based on three hours of staff time per parcel.
Carmel-by-the-Sea
The city keeps a file on every property, viewable on its planning GIS map. Gather the permits for past work before you list. See Carmel-by-the-Sea building permits.
Unpermitted work
The county says work already completed without a permit still needs one if it is cited, and you may have to expose the inside of walls to verify it. Decide early whether to permit it, disclose it, or both.
DRE: disclosures ↗County escrow reports ↗County building FAQs ↗City planning FAQ ↗
Getting it done before you list
Most of these items are quick if they are scheduled early.
Order of work
Order the sewer video and a look at fixtures, alarms and the water heater before photos. Repairs found by the video can take the longest.
Who pays
The rules say who must do or deliver each item, not always who pays. That is negotiated in the contract; the water retrofit can be done by either side.
Vendors
I have access to a large variety of trusted vendors.
Selling guides
See selling in Carmel-by-the-Sea, selling in Carmel and selling a Pebble Beach home.
Related guides
Other guides on this site that pair with this one.
- Buying a home in Carmel
- Buying a home in Carmel-by-the-Sea
- Buying a home in Pebble Beach
- Best real estate agent in Carmel
- Choosing an agent in Carmel-by-the-Sea
- Best real estate agent in Pebble Beach
- How I work with sellers
- Selling in Carmel-by-the-Sea
- Selling in Carmel
- Selling a Pebble Beach home
- Sewer lateral inspections
- Water credits
- Closing costs
- Cottage inspections
Getting ready to sell? Let’s clear the checklist first.
I schedule the water retrofit, sewer video and safety items before the house goes on the market, and gather the permit history so buyers see a clean file.
Carmel-by-the-Sea homesCarmel homesPebble Beach homes
Want a pre-listing checklist for your home?
Call or text 831-747-0310, or book a 30-minute call. I am a Broker Associate with Compass, DRE 01980970.
Before you rely on this
- This is general information, not legal advice. Some transfers may be exempt from some of these rules; ask your agent or attorney about your sale.
- Requirements are as published by MPWMD, CAWD, PBCSD and the California codes on Nov 23, 2026. Check each agency for changes.
- The city of Carmel-by-the-Sea sources I checked describe permits for work, not a separate resale inspection; confirm with the city for a specific property.
Point-of-sale requirements: quick questions
What is required when you sell a house in Carmel?
Usually the MPWMD Rule 141 water retrofit, a CAWD sewer lateral video inspection for homes in its area, the state smoke alarm statement, water heater bracing certification and plumbing fixture disclosure, carbon monoxide devices where required, and defensible space documentation in high or very high fire zones.
Who does the water retrofit when a house sells?
MPWMD says the seller or the buyer may complete the Rule 141 retrofits. An extension of up to six months from the purchase date can be requested.
Do I need a sewer inspection to sell in Carmel-by-the-Sea?
Homes served by CAWD, which serves the city, need a video inspection of the lateral on sale unless the whole lateral was replaced in the last 10 years.
Does Pebble Beach require a sewer inspection at sale?
Pebble Beach is served by PBCSD, not CAWD. Ask PBCSD whether anything applies to a sale.
Does California require smoke alarms when selling a house?
Yes. A single-family home that is sold must have an operable smoke alarm, and the seller must give the buyer a written statement of compliance.
Do I have to strap the water heater to sell?
Water heaters must be braced, anchored or strapped, and the seller must certify that in writing to the buyer.
What is the defensible space disclosure in California?
Since July 1, 2021, sellers in high or very high fire hazard severity zones must provide documentation of defensible space compliance where available, or sign an agreement for the buyer to obtain it.
Get The Balog Report.
Peninsula market notes, Carmel-by-the-Sea and Pebble Beach listings worth a look, and the practical local tips I share with clients between showings.
Want a sample? Read the latest issue. Planning a move? Get in touch.
The next issue of The Balog Report will land in your inbox. Can’t wait? Read the latest issue.


